“El Collado” Quarry

Info y ubicación

This quarry has an approximate surface area of ​​about 11 hectares. It began its exploitation in 1958 and was acquired by Arenas Forna in 2004 together with the cantera Peñalba .

In Cantera Collado nº 483, the extraction of aggregates was exhausted and the inert construction and demolition waste landfill activity began. strong> as final restoration of the quarry.

In addition, a new concrete manufacturing and distribution point was installed in the same quarry.

 

INERT LANDFILL FROM CONSTRUCTION AND DEMOLITION

We cover the works in the Marina Alta and Safor regions.

Admitted materials:

  • Clean Inert Waste: See the list of products in Annex I.
  • Mixed Inert Waste: that which is mixed with wood, plastic cardboard or iron, and which comes from the construction or demolition of a building.
  • Inert Dirty Waste: This will be Mixed Debris whose weight does not exceed 50% of the container, or 50% of the Maximum Authorized Load (M.A.P.) per truck.